BNSF Bridge No. 1.94

Work included the demolition of the existing 203-foot long bridge over Sangamon Street at 16th Street, constructing drilled-shaft retaining walls, and then filling in the viaduct. The work was performed under five live railroad tracks.

Project Address

947 W 16th St.
Chicago, IL 60608

Size

203 feet

Client

Burlington Northern-Santa Fe Railway